IND Industrial · Biñan, Laguna

Southgate Logistics Hub

A 14,000 sqm distribution facility built on a greenfield lot, from site development through to racking handover.

Client

Confidential · Placeholder

Location

Biñan, Laguna

Sector

Industrial / Logistics

Project type

Warehouse and distribution facility

Project size

14,000 sqm

Duration

11 months

Year completed

2023

Delivery model

Design and build

01 The project

A distribution hub built to a fixed opening date

The client needed a distribution facility operating before their peak season, on a lot that had never been developed. The building had to accommodate selective pallet racking eight levels high, twelve dock positions, and a slab flat enough for narrow-aisle equipment.

We were engaged under a design-and-build contract, which let structural steel fabrication start while the architectural package was still being finalised. Site development began as soon as the permit was released, so earthworks and steel fabrication ran in parallel rather than in sequence.

The facility was handed over with racking installed and tested, ahead of the client's stock transfer window.

02 Scope of work

  • Site clearing, grading and compaction
  • Storm drainage and perimeter works
  • Reinforced concrete footings and machine bases
  • Pre-engineered steel frame erection and cladding
  • Power-floated slab to specified flatness tolerance
  • MEP rough-ins, lighting and fire protection
  • Loading docks, levellers and dock shelters
  • Racking coordination, testing and turnover

03 Challenge

Wet-season earthworks on a lot with poor natural drainage, combined with a fixed operational date that could not move. Any delay to the slab would push racking installation past the client's stock transfer.

04 Our solution

Permanent storm drainage was built first and used during construction, which kept the platform workable through the rains. Steel fabrication was released early against approved shop drawings, and the slab was poured in bays so racking could start in completed sections.

05 Outcome

The building was completed within the eleven-month programme and turned over with racking tested. Floor flatness was verified against the specification before handover, and the drainage installed for construction stayed as the permanent system.

06 Gallery

During construction and at turnover

Select any photo to enlarge it.

07 Before & after

The same bay, eleven months apart

Drag the divider — or use the slider below — to compare the site during construction with the completed facility.

Demonstration images. Real project photography will replace these.

Warehouse interior during construction, before racking was installed The same warehouse bay after completion, with racking installed Before After

Have a similar project?

Send us the lot details, the target floor area and the date you need it operating. We will tell you what is achievable and what it is likely to cost.