General Construction
Ground-up execution as main contractor — from site mobilisation to turnover, under one accountable team.
PH General contractor & construction manager
Altamira Construction Group builds commercial, industrial and residential projects across Metro Manila, Luzon and the Visayas — ground-up construction, fit-outs and civil works, run by our own engineers and site teams.
15+
Years in operation
120+
Projects completed
80+
Clients served
40+
Engineers & site staff
01 Who we are
Altamira Construction Group was formed by engineers who spent their early careers on job sites, and the company still works that way. Every project is assigned a project manager, a site engineer and a safety officer who stay with it from mobilisation to turnover.
We work on both design-and-build and bid-and-build contracts, in new construction and inside buildings that have to keep operating while we work. Our estimating team prices from drawings and a site walk, so the budget you approve is the budget we build to.
02 What we build
Not sure which one fits? Describe the project and we will tell you. Explore our services
Ground-up execution as main contractor — from site mobilisation to turnover, under one accountable team.
One contract covering design coordination, permits, budgeting and construction, with a single point of responsibility.
Custom homes, townhouses and residential improvements built to a fixed scope and an agreed schedule.
Offices, retail developments and restaurants, including works inside operating buildings.
Warehouses, manufacturing facilities and plant structures where production uptime governs the programme.
Office and commercial interiors, refurbishments and phased works around occupied floors.
Foundations, concrete and structural steel, site development, roadworks and drainage.
Planning, procurement, cost control and progress monitoring for owners running their own trade packages.
03 Selected work
04 Why owners hire us
The project manager who prices your job is the one who runs it. No handover to a team you have never met.
Weekly reports pair the S-curve against actual accomplishment, with dated site photos for each item.
Every site gets a DOLE-accredited safety officer, a toolbox meeting each morning and a documented risk assessment.
Core concrete, steel and finishing crews are our own. Specialty trades are pre-qualified and supervised by us.
Costs are broken down per item. Variations are quoted and approved before the work starts, never after.
Programmes are based on crew output and procurement lead times, including a realistic allowance for rain days.
05 How a project runs
Typical duration from enquiry to mobilisation: 4–8 weeks, depending on permits.
We discuss scope, site, target budget and the date you need the space in use.
Our engineers visit the site to check access, existing conditions, utilities and constraints.
You receive an itemised cost estimate, a draft programme and a list of assumptions.
Drawings are finalised, permits filed, materials procured and the contract signed.
Works proceed against the approved programme, with weekly progress reporting.
Each phase is inspected and signed off before the next trade is allowed to close it up.
Punch list closed, testing and commissioning documented, as-built drawings and warranties handed over.
06 Sectors
If your project type is not listed, it is still worth asking — most of our work sits somewhere between these categories.
Talk to our team07 Client feedback
“They kept a hard turnover date without asking us to cut the specification. The weekly reports meant we always knew what was next.”
“Variations were quoted before the work started, so the final account matched what we approved. That is rarer than it should be.”
“Our plant kept running through the whole expansion. Their safety officer coordinated directly with our production supervisor.”
“We were first-time homeowners and they explained every line of the estimate. The site was clean and the crew was courteous.”
08 Credentials
PCAB Licence
No. XXXXX · Category placeholder
SEC Registration
No. XXXXX
BIR Registration
TIN XXX-XXX-XXX-XXX
Mayor's Permit
No. XXXXX · Placeholder LGU
ISO Certification
Standard and certificate no. to be supplied
Safety Accreditation
DOLE-accredited safety officers
Placeholder values shown. Actual licence numbers, validity dates and certificate scans will be supplied by the company.
Send us the drawings or just describe the scope. We will tell you whether we are the right contractor for it, and what it is likely to cost.